
Ridge Central · Phase 1 — Founders' Release

Ridge Central is planned as the city's address for business — offices, banks, a lifestyle mall, restaurants and a civic centre along a walkable boulevard. A 1,000 sqm plot suits a showroom, clinic, restaurant, office block or mixed-use building, subject to the district's planning guidelines. Pay outright or over 6 or 12 months.
Up to 20 plots of this type in one purchase, subject to availability.
Your plan
1 × Ridge Central · 12-month plan
One clear price. Every fee shown before you pay. Your price is locked the day you subscribe. You'll create your account (or sign in) before you pay anything.
Examples are illustrative, not guaranteed.
| Payment | Amount |
|---|---|
| Initial deposit (30%)To reserve | |
| Instalment 1 of 12Month 1 | |
| Instalment 2 of 12Month 2 | |
| Instalment 3 of 12Month 3 | |
| … 8 more instalmentsInstalment 12 of 12Month 12 | |
| Total |
Illustrative schedule. Instalments fall due monthly after you reserve; your portal shows your exact schedule and dates before you pay. Naira is the contract price — other currencies are indicative.

Ridge Central · Commercial & mixed use
Ridge Central, the town centre inside the main gateway, with a market, shops, banks, offices and a civic plaza; a frontage strip on its own service road along the Papalanto–Sagamu Road; a fifteen-minute centre in every neighbourhood; the Ridge Tech Valley business park; and, if Part B is secured, a lakeside district centre. About 108 acres, 5.4% of the city.
Indicative, subject to approvals.
Off-peak estimates from our frontage at Iro. Rush hour is slower. Measured 23 Oct 2026.
Murtala Muhammed International Airport, Lagos≈ 54 km · 49 min (off-peak)
Land from London, Houston or Toronto and reach the city in under an hour off-peak. Lagos peak-hour traffic takes much longer, so plan arrivals accordingly.
Operational · Operational — Nigeria's main international gateway. Source for Murtala Muhammed International Airport, Lagos (opens in a new tab)
Lagos Island (Marina)≈ 64 km · 55 min (off-peak)
Close enough for the meetings that matter, far enough to own land and breathe. We quote off-peak times and say plainly that rush hour is slower.
Operational · Road links in use. Peak-hour journeys are typically much longer than the off-peak estimate. Source for Lagos Island (Marina) (opens in a new tab)
Sagamu Interchange≈ 32–36 km · 33–37 min (off-peak)
The east end of our frontage road, where the Lagos–Ibadan Expressway meets the road to Ijebu-Ode, Ore and Benin — one junction to Lagos, Ibadan, the North and the East. Valuable for logistics, industrial and hospitality partners.
Works ongoing · Operational. Federal reconstruction of the Sagamu–Benin route continues. Source for Sagamu Interchange (opens in a new tab)
Papalanto–Sagamu Road (our frontage)Frontage · ≈ 1.7 km along the northern boundary
The land has about 1.7 km of frontage on the road that links the Lagos–Abeokuta Expressway at Papalanto with the Lagos–Ibadan Expressway at the Sagamu Interchange. We report the rebuild as works ongoing — we don't claim the stretch along our frontage is finished.
Works ongoing · Being rebuilt as a concrete dual carriageway under an Ogun State / Federal Government / Dangote partnership. In January 2026 the governor said about 25 of the roughly 40 km between Sagamu Interchange and Papalanto had been rebuilt, and the road was closed for reconstruction. Source for Papalanto–Sagamu Road (our frontage) (opens in a new tab)
Olorunsogo gas power stations (I and II)≈ 5.2 km · 8–10 min (off-peak)
Two large gas power stations about 5 km west, on our frontage road — a sign of the area's industrial role. Their capacity is nameplate, not a promise of power to the city; The Ridge City plans its own hybrid solar + gas supply.
Partly operational · Olorunsogo I (about 335 MW) and Olorunsogo II (NDPHC, about 675–750 MW nameplate, commissioned February 2015) are partially operational and limited by gas supply. Source for Olorunsogo gas power stations (I and II) (opens in a new tab)
Ofada and the Mowe–Ofada RoadOfada ≈ 12 km · 14 min · Mowe ≈ 24 km (off-peak)
The everyday route from the land to the Lagos–Ibadan Expressway runs east to Ofada, then down the Mowe–Ofada Road to Mowe. Finishing it improves that trip — we report its progress honestly rather than price it in.
Partly complete · Partly reconstructed. Residents reported in 2026 that the second section is still unfinished. Source for Ofada and the Mowe–Ofada Road (opens in a new tab)
Ofada town & Ofada rice≈ 12 km · 14 min (off-peak)
Ofada rice — aromatic, unpolished, premium-priced and served at upscale Nigerian celebrations — takes its name from Ofada town, about 12 km away by road. The planned Agri-Park keeps that heritage growing.
Current · Cultivation ongoing in Obafemi Owode. Source for Ofada town & Ofada rice (opens in a new tab)
Christopher University, Mowe≈ 20 km · 22 min (off-peak)
A university about 20 minutes away off-peak — part of the cradle-to-legacy promise, and a source of student and staff housing demand.
Operational · Operational. Reported fully accredited by New Telegraph in May 2025. Source for Christopher University, Mowe (opens in a new tab)
Lagos–Abeokuta Expressway at Papalanto≈ 20 km · 32 min (off-peak)
A second way into Lagos — west along our frontage road to Papalanto, then south through Ifo and Ota — and the road north to Abeokuta, the state capital.
Operational · In use. Reached west along the frontage road via Papalanto. Source for Lagos–Abeokuta Expressway at Papalanto (opens in a new tab)
Redemption City (RCCG), Mowe≈ 20–22 km · 25–30 min (off-peak)
Proof, about 20 km away, that a privately run city with its own power and water can work in this part of Ogun — and a year-round source of visitors for hotels, short-lets and restaurants.
Operational · Operational and expanding. Renamed Redemption City in August 2022. Source for Redemption City (RCCG), Mowe (opens in a new tab)
Lagos–Ibadan railway: Kajola and Papalanto stationsKajola ≈ 24 km · 40 min · Papalanto ≈ 28 km · 43 min (off-peak)
Two stations of the Lagos–Ibadan standard-gauge railway sit about 15–16 km away in a straight line. A useful complement to the road, not a daily commute.
Operational · The standard-gauge line runs passenger services in 2026. We have not confirmed which trains stop at Kajola or Papalanto — check the NRC timetable. Source for Lagos–Ibadan railway: Kajola and Papalanto stations (opens in a new tab)
Lagos–Ibadan Expressway at Mowe≈ 24 km · 33 min (off-peak)
Reached through Ofada and down the Mowe–Ofada Road, Nigeria's busiest inter-state route connects the city to Lagos, Ibadan, the North and the East. Continued federal spending points to better upkeep over time — though tolls may follow.
Works ongoing · In use. Federal expansion works continue; an operations-and-maintenance concession was approved in June 2026. Source for Lagos–Ibadan Expressway at Mowe (opens in a new tab)
Deeper Life International Conference Centre (Km 42)≈ 24 km · 33 min (off-peak)
Another of the region's great gathering places — recurring visitors mean recurring demand for rooms, food and services.
Operational · Operational; hosts the annual National December Retreat. Source for Deeper Life International Conference Centre (Km 42) (opens in a new tab)
30 MW Independent Power Plant, Onijanganjangan (near Ewekoro)≈ 24 km · 36 min (off-peak)
Embedded power is becoming normal in Ogun — the same thinking behind The Ridge City's planned hybrid solar + gas power.
Commissioned · Commissioned on 4 April 2026. Source for 30 MW Independent Power Plant, Onijanganjangan (near Ewekoro) (opens in a new tab)
NASFAT Islamic Centre, Asese≈ 25 km · 28 min (off-peak)
Muslim and Christian anchors side by side give the region a broad, settled community — and The Ridge City plans room for every faith.
Operational · Established on the expressway between Ibafo and Mowe; current development stage unclear. Source for NASFAT Islamic Centre, Asese (opens in a new tab)
Dangote Cement, Itori (not yet commissioned)≈ 26 km (approximate point, off-peak)
One of the largest industrial investments in this part of Ogun, a short drive west — jobs and suppliers that need homes and services nearby.
Works ongoing · A $700m, 6 Mt/yr plant on 533 ha, not yet commissioned. On 4 August 2026 Dangote signed an MoU worth more than $800m with Sinoma to double it to 12 Mt/yr. Source for Dangote Cement, Itori (not yet commissioned) (opens in a new tab)
Mountain Top University, Makogi-Oba≈ 29 km · 30 min (off-peak)
Adds to the number of universities within about half an hour of home, off-peak.
Operational · Operational. Founded in 2015 beside MFM Prayer City. Source for Mountain Top University, Makogi-Oba (opens in a new tab)
Distances and drive times are approximate road estimates from the site frontage on the Papalanto–Sagamu Road at Iro (a gate point converted from the provisional survey plan, ± about 200 m): off-peak free-flow estimates, OSRM, 23 Oct 2026. Rush-hour, road-works and event-day journeys take longer, and parts of the Papalanto–Sagamu road were closed for reconstruction in January 2026.
Title
Deed of assignment in place; provisional survey plan (OG/1089/2026/PROV.015) for Part A completed by a SURCON-registered surveyor; Certificate of Occupancy (C of O) application in process.