Iro (host community)
Towns & citiesIro, Obafemi Owode LGA
- Drive, off-peak
- 2 min
- By road
- 1.1 km (approximately)

Obafemi-Owode, Ogun State
The land
Outline from provisional survey plan OG/1089/2026/PROV.015, not to scale. An illustration, not a plot layout.
Getting there
Off-peak estimates from our frontage at Iro. Rush hour is slower. OSRM, 23 Oct 2026.
Olorunsogo power stations
8–10 min · ≈ 5.2 km
8–10 min≈ 5.2 km
Ofada town
≈ 14 min · ≈ 12 km
≈ 14 min≈ 12 km
Christopher University, Mowe
≈ 22 min · ≈ 20 km
≈ 22 min≈ 20 km
Redemption City
25–30 min · ≈ 20–22 km
25–30 min≈ 20–22 km
Lagos–Abeokuta Expwy (Papalanto)
≈ 32 min · ≈ 20 km
≈ 32 min≈ 20 km
Lagos–Ibadan Expwy (Mowe)
≈ 33 min · ≈ 24 km
≈ 33 min≈ 24 km
OOUTH teaching hospital, Sagamu
≈ 36 min · ≈ 35 km
≈ 36 min≈ 35 km
Kajola rail station
≈ 40 min · ≈ 24 km
≈ 40 min≈ 24 km
Babcock University
≈ 42 min · ≈ 44 km
≈ 42 min≈ 44 km
Lagos international airport (MMIA)
≈ 49 min · ≈ 54 km
≈ 49 min≈ 54 km
Gateway Airport, Iperu
42–53 min · ≈ 45 km
42–53 min≈ 45 km
Lagos Island (Marina)
≈ 55 min · ≈ 64 km
≈ 55 min≈ 64 km
Lekki Phase 1
≈ 63 min · ≈ 74 km
≈ 63 min≈ 74 km
6 places
Within 10 minutes
power & utilities 3 · towns & cities 3
12 places
Within 20 minutes
power & utilities 3 · towns & cities 3 · education 2
23 places
Within 30 minutes
education 6 · faith 4 · towns & cities 4
67 places
Within 45 minutes
towns & cities 10 · education 9 · health 8
127 places
Within 60 minutes
towns & cities 17 · education 15 · health 13
154 places
Within 90 minutes
education 24 · towns & cities 20 · health 14
Counts are cumulative, from 157 places measured. Kept only for comparison, beyond 90 minutes: Ibeju-Lekki (92 min) · Lekki Deep Sea Port (111 min) · Dangote Petroleum Refinery, Lekki FTZ (118 min).
Every location has trade-offs. Here are ours, and what we do, or plan to do, about each.
The honest risk
Trips to Lagos use the Lagos–Ibadan Expressway (via Ofada and Mowe) or the Lagos–Abeokuta Expressway (via Papalanto). Both can gridlock at rush hour, after crashes and on big event days at the faith camps; the Ibadan-bound stretch of the Lagos–Ibadan was declared 'failing' in June 2026, and our own frontage road was closed for reconstruction in January 2026.
Our answer
The Ridge City is planned so daily life doesn't depend on the commute: jobs, schools, healthcare and shopping inside the city, plus planned shuttles to the expressways and rail. We always quote off-peak times as off-peak and never promise a fixed time to Lagos.
The honest risk
Government projects in the area have run late: the Lagos–Ibadan Expressway reconstruction began in 2013, the Mowe–Ofada road's second section is unfinished, the Papalanto–Sagamu rebuild — targeted at 70% by December 2025 — stood at about 25 of about 40 km in January 2026, and the Red Line extension into Ogun is only under discussion.
Our answer
We label every outside project Operational, Works ongoing or Proposed, with its source and date — and our prices don't assume anything unbuilt. The city's own infrastructure is planned in phases, and we'll report it publicly with dated progress and drone updates.
The honest risk
In June 2026 the Federal Executive Council approved a private concession for the expressway. Toll terms are not public yet, and tolls could raise the cost of commuting.
Our answer
On-site jobs and services reduce how often residents need the expressway, and the Lagos–Abeokuta Expressway via Papalanto and the Sagamu–Ikorodu road offer other routes into Lagos.
The honest risk
Gateway Airport is new: it began on an interim operating permit, its schedules are still growing, and its only international flights so far are Hajj charters.
Our answer
We describe it as 'commissioned and growing' and never imply scheduled international flights. Lagos's international airport remains about 54 km away (about 49 minutes off-peak).
The honest risk
The Lagos–Ibadan railway runs a limited passenger timetable. Its nearest stations, Kajola and Papalanto, are about 24–28 km away by road, and we have not confirmed which trains stop there.
Our answer
We present rail as a complement to the road, not a daily commute, and plan shuttle links to the nearest stations.
The honest risk
Quality varies across the region's hospitals — in 2019 Ogun's governor described the state teaching hospital as 'worse than deplorable'.
Our answer
Ridge Health is planned inside the city — a maternity and children's hospital, a specialist hospital and diagnostics — and we're seeking reputable operators as partners.
The honest risk
Buyers in Ogun worry about government acquisition, family-land disputes (omo onile) and slow title processing. Lagos registry searches don't cover Ogun land.
Our answer
We publish our exact title status — "Deed of assignment in place; provisional survey plan (OG/1089/2026/PROV.015) for Part A completed by a SURCON-registered surveyor; Certificate of Occupancy (C of O) application in process." — and a document roadmap you can track in your portal. We encourage independent searches at the Ogun State Bureau of Lands and Survey and will share copies of our documents with your lawyer.
Distances and drive times are approximate road estimates from the site frontage on the Papalanto–Sagamu Road at Iro (a gate point converted from the provisional survey plan, ± about 200 m): off-peak free-flow estimates, OSRM, 23 Oct 2026. Rush-hour, road-works and event-day journeys take longer, and parts of the Papalanto–Sagamu road were closed for reconstruction in January 2026.

Nearby
Within (off-peak drive)
Category
157places — showing 24
Towns & citiesIro, Obafemi Owode LGA
Towns & citiesObafemi Owode LGA
Power & utilitiesMokoloki
Towns & citiesObafemi Owode LGA
Power & utilitiesOlorunsogo (Papalanto axis)
Power & utilitiesOlorunsogo (Papalanto axis)
Markets & mallsOfada axis
HeritageOfada
EducationOfada
EducationOfada
HealthOfada axis
HealthMowe–Ofada road
Markets & mallsMowe
EducationMowe
FaithMowe
Towns & citiesObafemi Owode LGA
FaithAsese
EducationIbafo
FaithLagos–Ibadan Expwy, Obafemi Owode
FaithMowe (Km 46)
Educationnear Redemption City, Mowe
Markets & mallsRedemption City, Mowe
EducationMakogi-Oba, Ibafo
FaithMagboro
Places come from OpenStreetMap and Wikidata; points marked “approx.” are placed at village, town, campus or area level. Inclusion is not an endorsement by, or affiliation with, any place listed.
Each carries its status, its sources and how sure we are. Operational means open today; works ongoing, designated and proposed mean exactly that.
Showing 9 of 33 places.
Transport
Works ongoingFrontage · ≈ 1.7 km along the northern boundary
The land has about 1.7 km of frontage on the road that links the Lagos–Abeokuta Expressway at Papalanto with the Lagos–Ibadan Expressway at the Sagamu Interchange. We report the rebuild as works ongoing — we don't claim the stretch along our frontage is finished.
Status: Being rebuilt as a concrete dual carriageway under an Ogun State / Federal Government / Dangote partnership. In January 2026 the governor said about 25 of the roughly 40 km between Sagamu Interchange and Papalanto had been rebuilt, and the road was closed for reconstruction.
Closed for reconstruction as of January 2026 (ThisDay). Which stretches are finished has not been confirmed.
Transport
Operational≈ 54 km · 49 min (off-peak)
Land from London, Houston or Toronto and reach the city in under an hour off-peak. Lagos peak-hour traffic takes much longer, so plan arrivals accordingly.
Status: Operational — Nigeria's main international gateway.
Transport
Commissioned≈ 45 km · 42–53 min (off-peak)
Ogun's own airport — an alternative gateway for visitors from Abuja and the North, and a cargo base for the agro-processing and logistics businesses Ridge Works is planned for.
Status: Scheduled domestic flights since 7 October 2025; commissioned on 4 April 2026; Hajj flights to Jeddah in May 2026. Hajj charters are its only international flights so far.
No scheduled international passenger service. Hajj charters only so far.
Industry & jobs
Partly operational≈ 5.2 km · 8–10 min (off-peak)
Two large gas power stations about 5 km west, on our frontage road — a sign of the area's industrial role. Their capacity is nameplate, not a promise of power to the city; The Ridge City plans its own hybrid solar + gas supply.
Status: Olorunsogo I (about 335 MW) and Olorunsogo II (NDPHC, about 675–750 MW nameplate, commissioned February 2015) are partially operational and limited by gas supply.
Nameplate capacity, not a supply promise.
Faith
Operational≈ 20–22 km · 25–30 min (off-peak)
Proof, about 20 km away, that a privately run city with its own power and water can work in this part of Ogun — and a year-round source of visitors for hotels, short-lets and restaurants.
Status: Operational and expanding. Renamed Redemption City in August 2022.
The Ridge City is independent and is not affiliated with, or endorsed by, RCCG. Range reflects two points inside the camp.
Education
Operational≈ 20 km · 22 min (off-peak)
A university about 20 minutes away off-peak — part of the cradle-to-legacy promise, and a source of student and staff housing demand.
Status: Operational. Reported fully accredited by New Telegraph in May 2025.
Health
Operational≈ 35 km · 36 min (off-peak)
Tertiary care about 35 minutes away off-peak. Quality across the region is uneven — which is exactly why Ridge Health is planned inside the city.
Status: Operational; new facilities reported (UNICEF-supported oxygen plant 2023, RCCG-donated dialysis centre 2021).
Heritage
Current≈ 12 km · 14 min (off-peak)
Ofada rice — aromatic, unpolished, premium-priced and served at upscale Nigerian celebrations — takes its name from Ofada town, about 12 km away by road. The planned Agri-Park keeps that heritage growing.
Status: Cultivation ongoing in Obafemi Owode.
Policy
CurrentStatewide
A competitive state to build and do business in. Fifth, not first — and we'd rather tell you that than overclaim.
Status: PEBEC Subnational Ease of Doing Business report, December 2025: Ogun 5th of 37 at 59.9%.
Distances and drive times are approximate road estimates from the site frontage on the Papalanto–Sagamu Road at Iro (a gate point converted from the provisional survey plan, ± about 200 m): off-peak free-flow estimates, OSRM, 23 Oct 2026. Rush-hour, road-works and event-day journeys take longer, and parts of the Papalanto–Sagamu road were closed for reconstruction in January 2026.
Visit