Co-develop the city

No one builds a city alone.

We bring the land, the master plan, the approvals path, the trunk-infrastructure programme and protection for buyers' money, and invite qualified partners and institutions to bring what we do not. Our promise is about behaviour, not outcomes: we do not promise returns or dates.

Building or operating? See Partners.

Why now. Why here. Why Pertinence.

Sourced facts, with their dates. Third-party projects are run by others.

Why now

A corridor on the move.

A new airport 45 km away. Our frontage road, rebuilt in concrete.

Why here

Land that can carry a city.

A first town that can stand alone. A valley at its heart.

Why Pertinence

A group ready to be checked.

Co-founded in 2012. Land sold at scale.

Read the full case

Why now

  • A new airport 45 km away

    Gateway International Airport began scheduled domestic flights in October 2025 and was commissioned in April 2026.

  • Our frontage road, rebuilt in concrete

    The Papalanto–Sagamu Road is being rebuilt under an Ogun State, federal and Dangote partnership; about 25 of 40 km had been rebuilt by January 2026. We do not claim our stretch is complete.

  • Lagos keeps pushing outward

    The UN puts Lagos at about 12.8 million people in 2025; Ogun suburban rents rose by up to 100% in a year as renters moved out of Lagos.

  • A state that ranks for business

    Ogun ranked 5th of 37 in the 2025 Subnational Ease of Doing Business report.

  • Housing finance is widening

    FMBN launched a National Housing Fund mortgage for Nigerians abroad in August 2026. Mortgages need perfected title, which is why title is Phase 1's main work.

Why here

  • A first town that can stand alone

    Part A is 411.48 hectares (1,017.02 acres) on a provisional survey plan, with about 1.7 km of frontage on the Papalanto–Sagamu Road and an existing road along its east side. Eleven of the founder's thirteen uses fit in Part A alone.

  • A valley at its heart

    Open data suggest a broad, low valley through the middle of Part A. The plan builds on the ridges and keeps the valley as park, paddies and flood storage, subject to the hydrology study.

  • Power stations about 5 km away

    The Olorunsogo gas power stations sit about 5 km west, where the gas pipeline that feeds them ends. A gas spur is worth investigating; nameplate capacity is never a promise of supply.

  • Proof the model works here

    About 20–22 km away, Redemption City reports its own gas power station, its own water and more than ten schools (church-sourced figures). The Ridge City is independent of it and implies no endorsement.

  • Heritage with a name

    Ofada rice, a premium Nigerian heritage food, is named after the town about 12 km away. It anchors the city's Agri-Hub and paddies.

Why Pertinence

  • Co-founded in 2012

    Pertinence Group was co-founded by Dr. Sunday Olorunsheyi and Mr. Wisdom Ezekiel, who started out as local land sellers.

  • Land sold at scale

    Pertinence reports about 2.1 million sqm of land sold across 80 estate locations in seven states by August 2022.

  • Experience in this corridor

    IRE, a 350+ acre estate in Mowe, was launched in June 2022.

Our promise

Our promise is about behaviour, not outcomes. We will evidence the title before we rely on it, sell only what we can service, hold buyers' money in trustee escrow, open each phase only when its gates and its funding test are met, have progress verified independently, publish what is built against what was planned every quarter, and disclose any slippage within 14 days. We do not promise returns or dates.

homes planned in Part A
≈ 3,370
homes city-wide at build-out
≈ 7,700
on-site jobs at build-out
10,000–17,500

Indicative capacities, not forecasts. Capacities, not forecasts. Infrastructure is sized for a design population of 35,000. Build-out runs beyond 2056 in the planning case; the conservative 2056 case is the one we plan on.

What we tell every partner up front

  • Title is at an early stage. The survey is provisional and not yet lodged or charted; the deed and the C of O filing are being evidenced; registration, charting and the global C of O are Phase 1's main work, and the state controls their timing.
  • Flood risk is real. Ogun is among 31 high-risk states in the 2026 national flood outlook, so hydrology and block flood screening come before any binding sale.
  • On today's prices, land sales alone are not expected to pay for all of the city's infrastructure. That is the main reason we are inviting partners.
  • We sell only what we can service, one serviced neighbourhood at a time, with buyers' money held in escrow.
  • Access depends on roads we do not control: the frontage road under reconstruction and the expressway 24 km away. That is why the city must provide jobs and services on site.
  • Comparable new cities took longer than announced, so our windows come from a conservative model.

What we will put in the data room before any memorandum is released

The record above is about land sold and businesses built. It is not yet evidence of delivery: roads built, plots handed over, titles perfected and homes occupied. The Ridge City is several times the size of the group's best-known corridor project, which is exactly why it is structured as a partnership with specialists and independent verification.

  • An independent delivery audit of IRE and three to five past estates
  • A schedule of all estates, with their title and delivery status
  • Three to five years of audited accounts
  • Litigation and complaints registers
  • The regulatory status of every group entity
  • Title evidence and counsel's written title opinion
Sources

How the city sustains itself

Eight ways to build the city with us.

Every arrangement is negotiated case by case and documented by counsel. None carries a promised return.
  • Capital partnersStrategic investors, family offices, institutions and development-finance institutions (qualified partners only).
    Brings
    Equity for the master company or a phase company.
    Receives, on negotiated terms
    A negotiated shareholding at a documented, independently valued land basis, with board or observer seats, reserved matters and full information rights. Economics are set only in bilateral term sheets reviewed by both sides' counsel.
    Typical structure
    Special-purpose company with a shareholders' agreement
    Earliest, planning case
    Master company before the C of O; phase companies from Phase 1
  • Land-for-equity partnersLandholders (including any Part B landholders under an option), institutions or the state.
    Brings
    Land into a phase or a district.
    Receives, on negotiated terms
    A share in a phase or district company at an independent valuation, or an agreed share of units.
    Typical structure
    Special-purpose company; title held in escrow until perfected
    Earliest, planning case
    Part A from Phase 1; Part B no earlier than 2032
  • Co-development partnersResidential, commercial and mixed-use developers; cooperatives.
    Brings
    Build capacity and capital.
    Receives, on negotiated terms
    Serviced parcels on staged payments, bulk-purchase terms or land-for-units joint ventures; a design code and approvals support.
    Typical structure
    Bulk purchase; joint venture; build-for-off-taker
    Earliest, planning case
    Show village no earlier than 2030; terraces, staff homes and the town centre from 2032
  • Anchor operatorsHospital, school, hotel, resort, event, retreat, leisure, golf, sports, agribusiness, logistics and technology operators.
    Brings
    Operating capability and their own facility capital.
    Receives, on negotiated terms
    Long leases or anchor land terms, utilities to the boundary on a published schedule, time-limited category exclusivity and co-marketing.
    Typical structure
    Long lease; joint venture; development management
    Earliest, planning case
    Agri pilot 2027–2029; health and schools late 2030s; hotel 2040–2044; destination uses 2046–2050 (planning case)
  • Infrastructure partnersPower producers and energy-service companies, gas distributors, water and sewage concessionaires, waste operators, fibre providers and transport operators.
    Brings
    Capital, engineering and operations.
    Receives, on negotiated terms
    Concession or build-operate-transfer rights, land leases, and connection charges and tariffs approved by the regulator or published to residents.
    Typical structure
    BOT; concession; energy-service company
    Earliest, planning case
    Interim power no earlier than 2030; mini-grid 2033–2035; water and sewage concession 2033–2036
  • Finance partnersCommercial banks, development-finance institutions, guarantors, green-bond investors, housing financiers and mortgage banks.
    Brings
    Debt, equity in anchor assets, guarantees and mortgages.
    Receives, on negotiated terms
    Security and covenants on their own terms over the assets they finance, with the data, reporting and environmental and social standards they require.
    Typical structure
    Project finance; estate development loans; guaranteed bonds
    Earliest, planning case
    Construction finance after the C of O; utility finance once revenues exist
  • Public-sector partnersOgun State ministries and agencies, Obafemi-Owode Local Government and federal agencies.
    Brings
    Approvals, title processing, junctions and roads, grid links, police and fire.
    Receives, on negotiated terms
    Planned growth, jobs, affordable and workforce housing, and a documented public-private partnership where agreed.
    Typical structure
    Memorandum of understanding; PPP
    Earliest, planning case
    From 2027
  • Community & cooperative partnersIro and neighbouring host communities, traditional rulers, cooperatives, staff associations and employers.
    Brings
    Legitimacy, local knowledge and bulk demand.
    Receives, on negotiated terms
    A Community Development Agreement (local hiring, apprenticeships, scholarships, access to services, an interim burial arrangement and a grievance mechanism); staged bulk purchases for cooperatives; a voice in the community trust.
    Typical structure
    Community agreement renewed every five years; bulk purchase
    Earliest, planning case
    Agreement targeted within 2027

The first 1,000 days.

From 24 October 2026 to 20 July 2029: evidence the title, protect buyers' money, win the approvals and prepare one serviced neighbourhood.
  1. Days 1–100

    to 1 February 2027

    Title evidence and counsel's title opinion in the data room. To be confirmed.

  2. Days 101–365

    to 24 October 2027

    Survey lodged for registration and charting; root-of-title checks. Aspirational.

  3. Days 366–730

    to 23 October 2028

    Survey registration and charting complete; draft EIA with a public display and hearing. Aspirational.

  4. Days 731–1,000

    to 20 July 2029

    EIA certificate (targeted 2028–2029) and the Phase 1A layout approval (targeted 2028–2029). Aspirational.

See every action, with today's label

Days 1–100 (to 1 February 2027)

  • Title evidence and counsel's title opinion in the data room. To be confirmed.
  • Counsel's opinions under the ISA 2025 and FCCPA; SCUML registration. Aspirational.
  • Escrow policy adopted; trustee bank, independent quantity surveyor and EIA consultant appointed; a board with independent members. Aspirational.
  • Terms for the first release confirmed, with buyers' money protected in escrow. To be confirmed.
  • Phase 1A topographic survey, block flood screening and the land-user census commissioned. Aspirational.
  • Part B rights confirmed in writing. To be confirmed.

Days 101–365 (to 24 October 2027)

  • Survey lodged for registration and charting; root-of-title checks. Aspirational.
  • EIA terms of reference; hydrology, hydrogeology and geotechnical studies. Aspirational.
  • Community Development Agreement signed; city management company incorporated. Aspirational.
  • Independent cost plan and valuation; traffic study and the Phase 1 gate junction design. Aspirational.
  • Agri pilot started if hydrology confirms the paddy areas; the first partner MoUs. Aspirational.
  • First quarterly progress reports. Aspirational.

Days 366–730 (to 23 October 2028)

  • Survey registration and charting complete; draft EIA with a public display and hearing. Aspirational.
  • Master plan submitted; Phase 1A layout application; design code adopted. Aspirational.
  • Binding contracts for the first release only once its pre-sale gates are met. To be confirmed.
  • Utility licence applications; tender-ready designs for the Phase 1 gate and spine road. Aspirational.
  • First term sheets with anchors and qualified partners. Aspirational.

Days 731–1,000 (to 20 July 2029)

  • EIA certificate (targeted 2028–2029) and the Phase 1A layout approval (targeted 2028–2029). Aspirational.
  • Global C of O: no earlier than 2028; targeted 2028–2030. The state controls its timing. Aspirational.
  • Phase 1 gate and West Valley Drive under construction, only if the approvals are held and Phase 1 passes its funding test. Aspirational.
  • Allocation only after the layout approval; the first serviced-handover schedule published. Aspirational.

What day 1,000 will and will not look likeNo homes are expected to be occupied by day 1,000: the first are targeted no earlier than 2030 and, in the planning case, in 2031–2032. The global C of O may still be pending, because the state controls its timing. What should exist is evidenced title, the survey registered and charted, a counted and consulted community, an EIA or a completed public hearing, working escrow and independent reporting, and the first partners under MoU or term sheet.

How the city is funded

On today's prices, land sales alone are not expected to pay for all of the city's infrastructure. The city is funded in layers, and each phase opens only when an independent funding test shows its committed sources cover its costs.

The layers, from the ground up

  1. 1

    Land and sponsor equity

    The land; title, studies, the social baseline and approvals; overheads.

    From now. Title and studies are paid for first, before any bank will lend.

  2. 2

    Serviced-plot and bulk-parcel sales

    The servicing of the blocks sold, phase by phase.

    Buyers' receipts held in trustee escrow and released against certified works (proposed). Buyers buy land; they are not investors in the city.

  3. 3

    Equity in the master and phase companies; operator and developer joint ventures

    The remaining funding need, homes beyond plots, the town centre, hotels, leisure, schools and hospital buildings.

    Qualified partners only, under shareholders' agreements reviewed by counsel.

  4. 4

    Concessions and independent power producers

    Power plants, water and sewage works, waste, fibre and shuttles, on their own balance sheets.

    Licensed by OGERC, NMDPRA and NIWRMC; tariffs regulated or published.

  5. 5

    Development-finance, guarantee and green finance

    Anchor assets, revenue-earning utilities and certified green assets.

    To the IFC Performance Standards, on contracted cash flows.

  6. 6

    Mortgage and housing finance

    Buyers' homes and partner-built affordable housing.

    Only once title is perfected (Governor's Consent).

  7. 7

    Government partnership

    Junctions, the east road, Valley Boulevard, grid links and approvals support.

    Sought, never depended on.

No single layer carries the city, and buyers’ receipts are proposed to stay in their own phase’s escrow. No bank debt is assumed before the global C of O, and no money is spent on works beyond surveys, fencing, security and the farming pilot before the EIA certificate. Indicative capital needs by phase are shared only with screened, qualified partners, in the memorandum.

The capital ladder

Who funds what, as each milestone takes risk off the table.

  1. 1

    Before the C of O: title, studies, the EIA, the community agreement, Phase 1A design

    Sponsor equity; possibly a strategic minority in the master company

  2. 2

    After the C of O, layout approval and EIA: Phase 1A works and later releases

    Phase-company equity, escrowed servicing reserves and construction finance

  3. 3

    Operating utilities

    Utility project finance, possibly guaranteed bonds once revenues exist

  4. 4

    Anchors: hospital, schools, hotels, destination uses

    Asset companies with operator equity and, where they qualify, development-finance support

  5. 5

    Stabilised assets

    Sale to operators or institutions, or refinancing

The partnership memorandum, on request. The full memorandum (the plan in detail, the capital need by phase, the capital stack, governance, the risk register and the first 1,000 days) is released only to screened, qualified partners under a confidentiality agreement, as a numbered copy recorded in a distribution register. It is never offered as a download and never shown at roadshows.

Governance and transparency

Partners need to see where the money goes, and buyers need to know it is safe. These are the bodies and the rules, to be adopted before any money is taken.

Who does what

Proposed. These rules are to be adopted before any money is taken or any partner receives the memorandum.

  1. 1

    Pertinence Properties Limited

    The sponsor and master developer: holds the land today, owns the master plan and contracts the trunk infrastructure.

  2. 2

    Ridge City master company (proposed)

    Holds Part A's title once formed; sponsor and partner equity; a board with independent members.

  3. 3

    Phase, district and asset companies

    Where partners co-develop, under shareholders' agreements with reserved matters, deadlock resolution and arbitration.

  4. 4

    Escrow trustee bank

    Holds 100% of buyers' receipts for each phase and releases money only under the escrow agreement.

  5. 5

    Independent quantity surveyor

    Cost plans, funding tests, a certificate for every escrow release and quarterly verification.

  6. 6

    City management company

    Roads, drainage, landscaping, security, building control and utility interfaces, paid for by published service charges.

  7. 7

    Residents' association

    Represents owners and sits on the service-charge committee.

  8. 8

    Ridge City Community Trust

    The long-term custodian of the valley park and greenways, endowed from land proceeds only.

  9. 9

    Legacy Gardens perpetual-care trust

    Upkeep of the memorial park only: separate, irrevocable and audited.

Rules for money and information

  • Trustee escrow per phase

    100% of buyers' receipts with an independent trustee bank; no commingling with group funds.

  • Servicing reserves first

    Each plot's servicing cost is reserved first and released only against certified works.

  • A funding test for every phase

    A phase opens only when its approvals are in hand and an independent cost plan shows its committed sources cover its costs.

  • Quarterly public reports

    Every infrastructure item shown as Planned, In design, Under construction or Operational, with dates and drone footage.

  • Title updates every 30 days

    Until the C of O is granted, then for each batch of consents.

  • Slippage within 14 days

    Any slipped window disclosed with the reason and a new window.

  • Audited every year

    Annual audited accounts for every company and the city management company; an annual re-baselined cost plan.

  • Conflicts managed

    Independent board members, a conflicts register and related-party contracts at arm's length, approved by non-conflicted directors.

  • Group safeguards

    The city is ring-fenced from the group's retail-finance businesses: no cross-selling to buyers and no rental-yield or 'farm returns' products.

  • No finder's fees

    Sales affiliates never receive partner materials and earn no fee on any partner or capital introduction.

  • Compliance

    SCUML and AML/KYC for every partner and buyer; NDPA data protection; FCCPA consumer protection; ARCON vetting; counsel's opinion under the ISA 2025.

  • People and environment

    An EIA to the IFC Performance Standards, a land-user census, a livelihood-restoration framework, a heritage protocol and a grievance mechanism.

The data room, for shortlisted partners under a confidentiality agreement

Title
The provisional survey plan, the deed of assignment and its registration evidence, the chain of title, the C of O filing and counsel's opinion.
Ground and people
Topographic, flood, hydrology and geotechnical studies; the land-user census and social baseline; the EIA as it is completed.
Approvals
Master plan and layout approvals, as they are granted.
Money
The independent cost plan, the escrow agreement and account letters, the ring-fence policy and quarterly reports.
Integrity
Corporate documents, SCUML and beneficial ownership, the delivery audit, audited accounts and the litigation, complaints and conflicts registers.
Risk
The risk register, with an owner and an early-warning sign for every risk.

Tell us what you would bring.

For companies, regulated financial institutions, development-finance institutions, public bodies and registered cooperatives, acting in a professional capacity. Not for individuals.

Looking for a home or a plot? You buy land under a sale contract: a purchase of land, not an investment in the city. See plots and prices

How we handle an expression of interest
  1. 1

    Acknowledgement (Immediately). We confirm receipt.

  2. 2

    Screening (Within 5 business days). A qualified-partner check, and fit with the plan and the phase.

  3. 3

    Confidentiality and data room (After screening). A mutual NDA, a numbered copy of the memorandum and access to the data room.

  4. 4

    Due diligence, both ways (Up to 20 business days). Your corporate, capacity and compliance documents; our title evidence, studies, delivery audit and plan.

  5. 5

    Term sheet (Within 10 business days of due diligence). Reviewed by both sides' counsel: title wording, infrastructure schedule, staged payments, governance and buyer protection.

  6. 6

    Agreement and approvals (Case by case). Definitive agreements and any approvals the law requires.

What to send

  • Your organisation, registration details and beneficial owners, and the basis on which you are a qualified partner
  • Your sector and the partnership category you are interested in
  • Your track record and capacity (scale of land, facility or capital, and your financing approach)
  • The phase and part of the city you have in mind, and what you would need from us
  • Your licences and, where relevant, your SCUML certificate

How we screen: out of 100, 70 to proceed

Track record 25 · Financial capacity 25 · Anchor value to the city 20 · Compliance 15 · Design quality 10 · Speed to start 5

What we will not do

  • Take money with an expression of interest
  • Accept subscriptions from individuals
  • Promise returns, yields, buy-backs, capital growth or dates
  • Pay any commission or finder's fee on a partner or capital introduction
  • Release the memorandum without screening, an NDA and a numbered copy
  • Name any partner publicly without a signed agreement and written consent
Read the full compliance notice

Prefer email? Write to partners@theridgecity.com.

Expression of interest

No money is accepted, and no obligation is created on either side.

The scale of capital, land or facility you could bring. No money is accepted with an expression of interest.

The partnership category, the phase and part of the city you have in mind, your track record, and what you would need from us.

Treated in confidence. Shared only with our partnerships and legal teams.